Mission Status Report
|
Mission Status Report #4 Star Date: June 27, 1999
Photo: FUSE launch photo, courtesy of NASA.
(Click photo to see larger version.)
FUSE CHECKOUT CONTINUES ON TRACK
Date: Sat, 26 Jun 1999 17:00:15 -0400 (EDT)
From: Bill Oegerle
Subject: FUSE IOC, June 26
FUSE IOC (in-orbit checkout), day 3
FUSE continues to operate well.
On a gorgeous summer day, we were all huddled in the windowless control
room at JHU, waiting to turn on the instrument flight computer (IDS).
At noon, we turned on IDS-B (the backup IDS) and turned it off. We then
turned on IDS-A. At a subsequent ground station pass, IDS-A was
successfully booted to application mode. We were biting our nails when
the bulk-memory manager test gave an "error" message, but it turned out
that in this case the message indicated a "normal" completion! So, we have
all 48 MB of bulk memory available with no bad memory blocks.
We are trying to accelerate the schedule a little, and turn on the
IPSDUs (instrument power system distibution units) later today. If we
can get this done, then we can start loading and activating the thermal
control tables a day early. The sooner we get started on this the better --
this allows the structure to bake out more, and will hopefully result in
an earlier turn-on of the FUV detector.
The SCC (satellite control center) is working well, and our
communications with TDRSS, and ground stations at Hawaii and Puerto Rico
have been good. There is a software problem at Hawaii preventing us
from fully utilizing this site, but this should be fixed soon.
--Bill Oegerle, Science Ops Lead
Date: Sun, 27 Jun 1999 09:27:37 -0400
From: JB Joyce
Subject: FUSE Status Report-June 27,1999
Please be advised of the latest FUSE status:
* All primary spacecraft subsystems continue to function nominally
- Spacecraft subsystem monitoring and trending are ongoing
* FUSE Satellite Control Center Systems continue to operate nominally
- JHU/UPRM ground station support is nominal
* Instrument Data System-A (IDS-A) powered on successfully
* Both Instrument Power Switching Data Units (IPSDU-A and-B) powered on
- all currents, voltages, and temperatures are nominal
* Thermal Control Tables Loaded
Planned Activities:
* Activate Thermal Control
* Continue activation and checkout of IDS-A
- Load projects,load/dump tables
************************************
* *
* J.B.Joyce *
* FUSE Mission Operations Manager *
* *
************************************
Reported by: Bill Oegerle, Science Ops Lead, and J. B. Joyce, Mission Operations Manager
|